I changed the plan slightly
I have a friend helping me with the interior but here are a few photos. It should be finished in 2 weeks
This is the main room. Window on the right and I’m stood in the exit corridor. We had a problem with the ordering of the windows so that has delayed the job. Low energy LED lights in the corners of the ceiling so as not to get into the clients eyes. The back ones can be switched off too.
View from by the window in the therapy room. Door in the middle is into the waiting room. One on the right is into the hall to the loo and on the left will have a door once they arrive. That will allow clients to exit the room without crossing over with anyone who may be in the waiting room
This is the waiting room with separate doors for the therapy room (right) and access to the bathroom (left)
This is the bathroom mid build. It is big enough for a wheelchair to get in (and the doors are all wide enough for wheelchair access)
The whole setup has underfloor heating and LED lights for low running costs (I hope!)
I am excited about getting it finished for my first client to try it out on the 20th October.
These are two paintings which I love which will be hung up in there. My friend is going to design around them.
Here is a little video to show you round the place.
If you want to learn about what I will do in there, check out my website www.thinkitchangeit.com
